top of page

Case Study | Shizheng Rd, Phase 1 – Taichung City

  • Writer: Billing Marmot
    Billing Marmot
  • May 9
  • 1 min read

Updated: Nov 7

Starting from December 2024, Billing Marmot pavement license plate recognition and billing devices will be implemented, with installation and construction taking place on certain sections of Shizheng Road.

During the installation of natural drainage device at the roadside parking spaces of the National Taichung Theater, cable laying work for cable operator will be carried out.
During the installation of natural drainage device at the roadside parking spaces of the National Taichung Theater, cable laying work for cable operator will be carried out.

Pioneering Innovation in Urban Aesthetic Design


With the advancement of smart cities, technological devices have evolved beyond mere functionality to become integral elements of urban aesthetics. Our intelligent roadside parking solutions feature a concealed design that seamlessly blends into the metropolitan landscape, achieving a harmonious coexistence between technology and its surroundings. Whether in bustling commercial districts or verdant residential neighborhoods, the design of our equipment preserves the city’s character while enhancing the overall visual quality.


Current Status After Equipment Installation at Roadside Parking Spaces in Front of National Taichung Theater
Current Status After Equipment Installation at Roadside Parking Spaces in Front of National Taichung Theater

Selecting Suitable Equipment Models for Different Environments


To achieve optimal performance, the choice of equipment must correspond to the specific parking environment and road conditions. We offer a variety of models, including devices designed for installation on curbs as well as drainage-equipped units to meet diverse site requirements. Additionally, our equipment can be optionally integrated with camera modules and batteries to ensure superior recognition accuracy and extended battery life, providing a flexible and efficient smart roadside parking management solution.


Current Status After Equipment Installation at Roadside Parking Spaces around Maple Garden
Current Status After Equipment Installation at Roadside Parking Spaces around Maple Garden



—— Shizheng Road Phase 1 — Current Status ——





Comments


CONTACT US

​中礦發展股份有限公司

台中市南屯區大業里大聖街342號

No. 342, Dasheng St., Daye Vil., Nantun Dist.,

Taichung City 408033, Taiwan (R.O.C.)

04-23106166#203(Mr. Liu)

The message has been sent to our mailbox, please wait patiently for a reply!

LINE QRCODE

CHUNG KUANG DEVELOPMENT CO., LTD.

bottom of page